NGO: tenders
Tender Title: Engineering Service For Structural And Fire Safey Assessment For Iom Office, Erbi |
|
Tender No: 22478 |
Location: Erbil |
Tender Package Available from: 2024-09-15 |
|
Deadline for Offer Submission: 2024-09-22 at 17:00 (Iraqi Time) |
Terms of Reference (TOR)
Project Location: 36.22097351414576, 44.009139984659704
Off Bahirka Road, Next to Hungarian Consulate, 40 Meter Road, Erbil, 44001
DOCUMENT CONTROL SHEET |
|||
Country: |
Iraq |
||
Project Title: |
Engineering Services for Structural and Fire Safety Assessment for IOM office, Erbil. |
||
Document Title: |
Terms of Reference |
||
Document No.: |
|
||
Revision: |
01 |
Status: |
Draft |
Author(s): |
Infrastructure / SCU |
Reviewed by: |
|
Office of Origin: |
Erbil |
Issue Date: |
29 August 2024 |
Tabel of Content:
1.............. Project Description.................................................................................................................. 4
2.............. Scope Of Services and Expected Outputs.................................................................................. 5
2.1........... Desktop Review / Document Screening and Preliminary Surveys:........................................................ 5
2.2........... Design Check and Nondestructive Testing:...................................................................................... 5
3.............. Deliverables/ Reports.............................................................................................................. 6
4.............. Requirements For Progress Updates........................................................................................ 7
5.............. Project Controls....................................................................................................................... 7
6.............. Duration of Work / Project Milestone...................................................................................... 7
7.............. Qualifications of the Successful Service Provider...................................................................... 8
8.............. Location of Work..................................................................................................................... 8
9.............. Criteria for Selecting................................................................................................................ 8
The United Nations INTERNATIONAL ORGANIZATION FOR MIGRATION (IOM) – Iraq, Erbil Office is currently using a B + G + 2 story building as office facility. The building was originally designed and constructed for Supermarket purpose. A structural, Mechanical and fire safety assessment is required to confirm the building can be used for office purposes, considering architectural modifications and service requirements.
IOM requires a complete structural assessment of the building by an external and independent consultancy firm to review and assess its structural capacity, architectural modification feasibility and Fire safety services reliability, and to certify that it meets the requirements for office space as per the Government of Iraq’s building construction guidelines and regulations. Additionally, the existing building faces multiple Operation and Maintenance (O&M) issues on daily basis. The potential consultancy firm is requested to find out the root cause of O&M defects and recommend a full rectification plan.
IOM is of the concern that the building should be free from any difficulties on serviceability for the intended use of office premises. During physical inspection of the building, no major inconsistency were noticed, but IOM needs to ensure that the building is constructed in accordance with the applicable rules and regulations and as per the list of deliverables contained in section 3.
The Engineering Consulting Firm’s responsibilities shall include, but not be limited to the following:
The initial phase involves a comprehensive examination of the Desktop Review / Document Screening and Preliminary Surveys:
Site Visit: A site inspection and condition assessment will be carried out to verify the construction's precision and its alignment with the specified design outlined in the design documents. A standardized checklist will be created to guarantee consistent and comprehensive data collection. Detailed notes and photographs will be captured to record the on-site conditions accurately. The site visit will cover the following components:
Design check: Based on the available documents and collected data, a design check will be conducted and will include the following components:
For items that require modifications, the design, drawings, and BoQ will be prepared for the Client to allow implementation of such recommendations.
Brief weekly reporting will be provided to the Client summarizing activities and findings for the week, conclusion, and any proposed changes to the project work plan. At the end of the project, a brief project report will be submitted including any relevant recommendations. Among others, the project report will include key findings and recommendations pertaining to:
The Consultant/firm shall submit to the Client a very brief progress report on a weekly basis which also alternative can be in a mode of online meeting. The report shall detail the work planned, the actual work performed, any complications encountered, milestones reached and the overall status of the project. Delays on the project should be clearly explained and the Consultant/firm shall provide proposals to recover lost time. The format of the progress reports or sharing the meeting minutes (if mode is online/physical meeting) shall be agreed with the Client at project signing.
The Consultant/firm is requested to submit details of the measures that will be put in place to ensure the best practice management of the Project as well as on-going project control. This shall include:
The following table identifies the deliverables and their respective time for completion that the Consultant/firm shall provide to successfully complete the services: -
Sl no |
Description |
|
|
|
|
|
|
Week 01 |
Week 02 |
Week 03 |
Week 04 |
Week 05 |
Week 06 |
||
01 |
Desk Review |
|
|
|
|
|
|
02 |
Site visit |
|
|
|
|
|
|
03 |
Design Check |
|
|
|
|
|
|
04 |
Draft Reporting |
|
|
|
|
|
|
05 |
Final Report |
|
|
|
|
|
|
The consultancy subject to this Scope of Services is intended to reveal issues first, and then to propose recommendations on how to resolve them. For this specific case, the principle Structural Engineer needs to have a level of proved engineering expertise of at least 10 years and be an expert in the relative field of work of building structural assessment and design review subjected to extreme event. In addition to structural engineer, consultant firm should have professional geotechnical engineer, Electrical engineer, Mechanical Engineer, Plumbing Engineer, and Fire Safety Expert. The Consultant/firm shall submit their CVs of the proposed technical personnel as part of the bid, to the Client’s approval and assessment. Furthermore, the consultancy firm should have the following minimum capacities.
Off Bahirka Road, Next to Hungarian Consulate, 40 Meter Road, Erbil, 44001. 36.22097351, 44.009139984
This section should indicate the full list of criteria which shall serve as a basis for evaluating offers and awarding the contract, based on technical and financial offers. It must also indicate if the award will be done in following manner:
To qualify for award of the Contract, bidders shall meet the following minimum qualifying criteria (Pass/Fail system), in case fail of any of the following criteria bidder will be disqualified in technical evaluation.
Criteria |
Comment / proof provided |
Pass/Fail |
|||
Part-A: Pre-qualification Criteria (Mandatory) |
I |
Existence of proof that business has been registered, |
Trade License # Validity till: |
|
|
II |
Organization/Consultant Profile: Reputation of Organization and Staff / Credibility / Reliability / Industry Standing |
Provided Organizational Profile: |
|
||
III |
Acceptance of IOM General Conditions |
Submitted Acceptance of IOM General Conditions: |
|
||
IV |
Acceptance of UN supplier Acceptance of UN supplier Code of Conduct |
Submitted Acceptance of UN supplier CoC: |
|
||
Part B - Evaluation Criteria |
1 |
Previous Experience • Minimum five years of experience in the same field and 2 sample assessment works that commenced in past. |
Documentary evidence of Minimum five Years and value: 2 Sample Assessment Works: |
|
|
2 |
Value of Consultancy works executed in last 3 years |
Purchase order/Completion Certificate 1: |
|
||
3 |
Financial Capacity |
Annual turnover for the last 3 years:
Bank Statement: |
|
||
4 |
Resources/Personnel deployed for tendered project Consultancy company must have deployed following technical personnel but not limited only to • One (1) Architect (Full time), with minimum MSc in Architecture with minimum 7 years of experience in relevant/similar projects or BSc in Architecture with minimum 10 years of experience in multistory architectural design and review projects. • One (1) Structural Engineer (Full time), with minimum MSc in Structural Engineering with minimum 5 years of experience in relevant/similar projects or BSc in Civil Engineering with minimum 8 years of experience in Structural design and review projects. • One (1) Geotechnical Engineer (Full time), with minimum MSc in Geotechnical Engineering with minimum 5 years of experience in relevant/similar projects or BSc in Civil Engineering with minimum 8 years of experience in Geotechnical design and review projects.
• One (1) Plumbing Engineer (Full time), with minimum BSc in Civil/Mechanical Engineering with minimum 5 years of experience in relevant/similar projects. •One (1) Senior Electrical Engineer (Full time), with minimum BSc in Electrical Engineering with minimum 3 years of experience in relevant. •One (2) Mechanical Engineer (As needed for relevant task), with minimum BSc in Mechanical Engineering with minimum 3 years of experience in relevant/similar projects or Diploma in Mechanical Engineering with minimum 6 years of experience in relevant/similar projects. •One (1) Fire Safety Expert (Full time/need based), with minimum BSc Civil/Electrical/Mechanical/equivalent with a professional training of fire safety planning and design with minimum 5 years of similar experience. |
Principal Structural Engineer: Qualification: Degree: Years of Experience: Membership:
Architect: Qualification: Degree: Years of Experience: Membership
Structural Engineer: Qualification: Degree: Years of Experience: Membership: Geotechnical Engineer: Qualification: Degree: Years of Experience: Membership: Plumbing Engineer: Qualification: Degree: Years of Experience: Membership: Senior Electrical Engineer: Qualification: Degree: Years of Experience: Membership:
Mechanical Engineer: Qualification: Degree: Years of Experience: Membership: Fire Safety Expert: Qualification: Degree: Years of Experience: Membership: |
|
||
5 |
Methodology and Submitting PPT Sample Provide a sample PPT (3-5 slides) to be presenting to client before submitting final report. Plan |
Submitted methodology and execution plan:
Sample PPT submitted: |
|
||
6 |
Detailed Work Plan and timeline: |
Scheduled workplan duration:
|
|
||
Comments on overall assessment |
|
|
|||
Appendix A :
SITE LOCATION MAP
(To be provided during project inception meeting)
Appendix B
RELATED DRAWINGS & CERTIFICATES
(to be provided during project inception meeting)
Appendix C
List of Security Risk Management Measures for UN offices in Erbil, Iraq.
(To be provided, in case required.)
Copyright @2023 Design & Developed by Job Helper